1.
Jeff Davis Electric Co-op, Inc.
Serves nearly 7000 member/owners in Allen, Calcasieu, Cameron, Jefferson Davis and Vermilion parishes in Louisiana. Includes service map and information ...
2.
Meter Pole Specifications
Meter base grounding, minimum, #6 soft drawn (s.d.) copper, in conduit from the meter base to. the ground rod furnished and installed by customer. ...
3.
Meter Pole Specifications
TEMPORARY meter pole/timber must be 18' (feet) in length and be set 4' (feet) deep ... An extension of 18 " (inches) of service conductor is required at the ...
4.
Jeff Davis Electric Co-op, Inc.
Serves nearly 7000 member/owners in Allen, Calcasieu, Cameron, Jefferson Davis and Vermilion parishes in Louisiana. Includes service map and information ...
5.
Conserving Energy
Conservation simply means to guard against waste, to be aware of the inefficient ways electricity can be used, and to do something about it. ...
6.
Meter Pole Specifications
PERMANENT meter poles shall be 20' (feet) in length and be set 5' (feet) deep. A PERMANENT meter pole must be a treated round pole with a minimum top ...
7.
Meter Pole Specifications
PERMANENT meter poles shall be 20' (feet) in length and be set 5' (feet) deep. A PERMANENT meter pole must be a treated round pole with a minimum top ...
8.
Conserving Energy
Conserving electricity does not mean depriving yourself of comforts and conveniences. Conservation simply means to guard against waste, to be aware of the ...
9.
Meter Pole Specifications
Meter Pole Specifications. It shall be the customer's responsibility for compliance ... Meter poles are furnished and installed by customer. Specifications ...
10.
Meter Pole Specifications
The pole grounding conductor shall be a minimum #6, bare, soft drawn copper wire and extend from 6 " (inches) above the top of the meter pole to the ground ...